The expert store now keeps the live B2B catalog from H008 and layers explicit PortOne payment states on top of the same drawer.
This route no longer stops at a contract-only cart. Domestic Korean organizations can prepare a PortOne-ready card draft, review-window inventory stays on manual review, and non-Korean organizations move into an international quote lane instead of sharing one misleading checkout path.
The first store catalog is intentionally small, but it already behaves like a live operator-facing route.
Each card below is a route-owned catalog unit: a named SKU, structured highlights, a B2B price point, and a live add-to-cart action that opens the right-side drawer without moving the page.
The cart drawer now drafts PortOne-ready checkout state, manual-review state, or international quote state from the same route.
The drawer can normalize buyer and cart state now, but checkout still fails closed until the public PortOne store and channel keys are configured.
- Items in cart
- 0
- Subtotal
- ₩0
Axis Assessment Starter Kit
reviewed supply rule가 local-first인 동안 월별 한정 배치로 준비됩니다.
- SKU
- SART-KIT-AXIS-02
- Unit price
- ₩142,000
Fulfillment note
reviewed supply rule가 local-first인 동안 월별 한정 배치로 준비됩니다.
Case Review Workbook
소규모 clinic team review session을 위한 workbook stack으로 출고됩니다.
- SKU
- SART-CASE-05
- Unit price
- ₩58,000
Fulfillment note
소규모 clinic team review session을 위한 workbook stack으로 출고됩니다.
Clinic Visual Poster Pack
bilingual-ready layout slot을 가진 flat print bundle로 출고됩니다.
- SKU
- SART-VISUAL-03
- Unit price
- ₩48,000
Fulfillment note
bilingual-ready layout slot을 가진 flat print bundle로 출고됩니다.
Demo Spine Alignment Model
더 무거운 B2B fulfillment rule이 붙기 전까지는 review-window item으로 운영합니다.
- SKU
- SART-DEMO-06
- Unit price
- ₩235,000
Fulfillment note
더 무거운 B2B fulfillment rule이 붙기 전까지는 review-window item으로 운영합니다.
Gait Cue Floor Kit
store가 pre-payment validation 단계에 있는 동안 한정 생산으로만 제공됩니다.
- SKU
- SART-GAIT-04
- Unit price
- ₩126,000
Fulfillment note
store가 pre-payment validation 단계에 있는 동안 한정 생산으로만 제공됩니다.
SART Core Reading Manual
clinic team과 operator onboarding을 위한 printed manual pack입니다.
- SKU
- SART-MANUAL-01
- Unit price
- ₩78,000
Fulfillment note
clinic team과 operator onboarding을 위한 printed manual pack입니다.
The expert store now exposes explicit B2B payment states instead of stopping at a contract-only cart.
This step keeps the reviewed-first catalog and drawer from H008, then adds a real checkout-session contract on top of it. Domestic card payments can move toward PortOne, review-window SKUs stay on manual review, and non-Korean organizations fall into an international quote lane instead of pretending every cart can be charged the same way.
Use this lane for Korean organizations that are ready to open a PortOne card session from the drawer.
Use this lane for non-Korean organizations that need manual tax, freight, or import handling before payment can proceed.
Use this lane whenever the cart contains reviewed-window equipment or other SKUs that must be checked by the REBOM team first.
H009 stops at explicit payment branching and checkout-session launch, not at final order persistence.
This phase proves buyer capture, PortOne launch readiness, manual review branching, international quote branching, and server-side checkout normalization. It does not claim that payment confirmation, inventory sync, tax logic, or shipping orchestration already exist.
One drawer, three payment lanes
The same cart drawer can now branch into domestic card launch, manual review, or international quote without reopening the route ownership settled in H008.
PortOne-ready, still fail-soft
Public store and channel keys unlock browser launch readiness, while the route still stays reviewable when those keys are absent.
Server verification stays separate
The later API-secret-backed verification step is advertised clearly, but it is not faked before order persistence and confirmation logic actually land.